Asset Integrity

  • Life Extension Study of a Pipeline System

    Challenge The client operates a pipeline system running from a gas separator plant to a…

    Find out more
  • Life Extension Study of a Production Field

    Challenge With the production field approaching the end of its design life in 2021, the client contracted Penspen to perform a life extension…

    Find out more
  • Risk Based Inspection and Integrity Analysis of a Compression Station

    Risk Based Inspection (RBI) and integrity anaysis of a compressor station located in the Americas…

    Find out more
  • Integrity Assessment of a 12” Pipeline

    Challenge The 12″ pipeline runs refined product in the terminal. The pipeline is 1.123 km…

    Find out more
  • 2019 Annual Technical Integrity Assessment Reports

    Challenge To provide an Annual Technical Integrity Assessment (TIA) report covering the year 2019 operations…

    Find out more
  • 2016 Annual Technical Integrity Assessment Reports

    Challenge To provide Technical Integrity Assessment (TIA) report covering latest year of integrity management (2016)…

    Find out more
  • Integrity Management and Compliance with Regulatory Requirements

    Challenge An offshore operator has developed a field as a tieback. The pipeline system consists…

    Find out more
  • Development of a Risk Based Inspection Scheme

    Challenge To review and update the existing Risk Based Inspection (RBI) scheme for pipelines system…

    Find out more
  • QRA for High Pressure Gas Pipelines

    We carried out a Quantitative Risk Assessment (QRA) for a pipeline running high pressure natural…

    Find out more
Penspen
Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.