Europe
-
Carbon Capture and Storage for National Grid in the UK
National Grid commissioned Penspen to undertake a research and development feasibility assessment into the transporting…
-
Integrity Assessment of a 12” Pipeline
Challenge The 12″ pipeline runs refined product in the terminal. The pipeline is 1.123 km…
-
2019 Annual Technical Integrity Assessment Reports
Challenge To provide an Annual Technical Integrity Assessment (TIA) report covering the year 2019 operations…
-
2016 Annual Technical Integrity Assessment Reports
Challenge To provide Technical Integrity Assessment (TIA) report covering latest year of integrity management (2016)…
-
Integrity Management and Compliance with Regulatory Requirements
Challenge An offshore operator has developed a field as a tieback. The pipeline system consists…
-
Development of a Risk Based Inspection Scheme
Challenge To review and update the existing Risk Based Inspection (RBI) scheme for pipelines system…
-
QRA for High Pressure Gas Pipelines
We carried out a Quantitative Risk Assessment (QRA) for a pipeline running high pressure natural…
-
Development of a Pipeline Integrity Management System for Offshore Pipelines
Challenge To revise and update the Pipeline Integrity Management System (PIMS) Manual, Major Accident Prevention…
-
Pipeline Uprating Study
Challenge To investigate the feasibility of uprating the 70 year old 108 km pipeline whilst,…