Home

Our Work

  • Integrity Assessment of a 12” Pipeline

    Challenge The 12″ pipeline runs refined product in the terminal. The pipeline is 1.123 km…

    Find out more
  • 2019 Annual Technical Integrity Assessment Reports

    Challenge To provide an Annual Technical Integrity Assessment (TIA) report covering the year 2019 operations…

    Find out more
  • 2016 Annual Technical Integrity Assessment Reports

    Challenge To provide Technical Integrity Assessment (TIA) report covering latest year of integrity management (2016)…

    Find out more
  • Integrity Management and Compliance with Regulatory Requirements

    Challenge An offshore operator has developed a field as a tieback. The pipeline system consists…

    Find out more
  • Development of a Risk Based Inspection Scheme

    Challenge To review and update the existing Risk Based Inspection (RBI) scheme for pipelines system…

    Find out more
  • QRA for High Pressure Gas Pipelines

    We carried out a Quantitative Risk Assessment (QRA) for a pipeline running high pressure natural…

    Find out more
  • Development of a Pipeline Integrity Management System for Offshore Pipelines

    Challenge To revise and update the Pipeline Integrity Management System (PIMS) Manual, Major Accident Prevention…

    Find out more
  • Pipeline Uprating Study

    Challenge To investigate the feasibility of uprating the 70 year old 108 km pipeline whilst,…

    Find out more
  • Western Isles Development, Topsides Engineering

    Challenge Penspen was engaged to undertake an EPC contract to design, manage and deliver a…

    Find out more