-
Risk Assessment of Geohazards
Challenge The gas pipeline operator manages a 24-inch Yetagun pipeline that exports gas from the…
-
Management & Assessment of Cracks in Pipelines in Latin America
Challenge Penspen were contracted to identify the damage mechanisms associated with cracking in a gas…
-
Inverness Airport Case Study
Project Background Inverness Airport, owned and operated by Highland and Island Airport Limited (HIAL), is…
-
Pipeline Pigging Assessment
Challenge The client operates a gas plant in a remote location in the Kurdistan Region…
-
Database Management and Baseline Integrity Assessment
Challenge The client is engaged in the extraction of Natural Gas Liquids (NGLs) from associated…
-
Life Extension Study of a Pipeline System
Challenge The client operates a pipeline system running from a gas separator plant to a…
-
Killingholme & Cottage Power Stations Hydrogen Assessment Study
Hydrogen assessment study for the Killingholme pipeline and Cottage power stations…
-
Life Extension Study of a Production Field
Challenge With the production field approaching the end of its design life in 2021, the client contracted Penspen to perform a life extension…
-
PMC Services for CO2 Recovery FEED Project
Challenge To evaluate the options for CO2 recovery from the gas plant. This included evaluating…