Home

Our Work

  • Risk Assessment of Geohazards

    Challenge The gas pipeline operator manages a 24-inch Yetagun pipeline that exports gas from the…

    Find out more
  • Management & Assessment of Cracks in Pipelines in Latin America

    Challenge Penspen were contracted to identify the damage mechanisms associated with cracking in a gas…

    Find out more
  • Inverness Airport Case Study

    Project Background Inverness Airport, owned and operated by Highland and Island Airport Limited (HIAL), is…

    Find out more
  • Pipeline Pigging Assessment

    Challenge The client operates a gas plant in a remote location in the Kurdistan Region…

    Find out more
  • Database Management and Baseline Integrity Assessment

    Challenge The client is engaged in the extraction of Natural Gas Liquids (NGLs) from associated…

    Find out more
  • Life Extension Study of a Pipeline System

    Challenge The client operates a pipeline system running from a gas separator plant to a…

    Find out more
  • Killingholme & Cottage Power Stations Hydrogen Assessment Study

    Hydrogen assessment study for the Killingholme pipeline and Cottage power stations…

    Find out more
  • Life Extension Study of a Production Field

    Challenge With the production field approaching the end of its design life in 2021, the client contracted Penspen to perform a life extension…

    Find out more
  • PMC Services for CO2 Recovery FEED Project

    Challenge To evaluate the options for CO2 recovery from the gas plant. This included evaluating…

    Find out more