Designing the Jet Fuel Hydrant System for Kuwait Airport’s New Terminal 2
Enhancing Fueling Efficiency to Support Kuwait Airport's Expansion
Photo Credit: Directorate General of Civil Aviation, State of Kuwait
Project Background
Our client, a leading Project Development Contractor, awarded Penspen a contract to provide detailed engineering services to support the EPC works for the development of a new passenger terminal at Kuwait International Airport and expansion of the hydrant system network to serve the new passenger terminal.
A hydrant system is a ground-based fuel distribution network that efficiently delivers jet fuel directly to aircraft via pipelines, reducing the need for fuel trucks and improving refuelling speed, safety, and overall operational efficiency at the airport.
Services
Engineers from Penspen’s regional head office in Abu Dhabi, UAE, are overseeing the project and will deliver a range of detailed engineering services to support the EPC scope, which includes:
- Construction, procurement and supply of all materials, plant, equipment, and consumables.
- Site preparation and associated civil work
- Installation of new hydrant refuelling pit assemblies
- Installation of new vent/drain assembly
- Construction of new sectionalising valve chambers
- Tie-in to existing hydrant pump discharge piping at KAFCO New Fuel depot
- Installation of a new cathodic protection system
- Installation of new RTUs in the NPT area including connection to existing control system at new fuel depot
Result
With the project set to complete in Q1 2025, the new passenger terminal and hydrant system at Kuwait International Airport will enhance refueling efficiency, safety, and operational capacity, supporting future growth and improving the passenger experience at Kuwait International Airport. Once operational, the new terminal will triple the airport’s capacity, allowing it to accommodate up to 25 million passengers annually.
Related Projects

Designing the Jet Fuel Hydrant System for Kuwait Airport’s New Terminal 2
Penspen provides engineering services for the Jet Fuel Hydrant System at Kuwait International Airport's New Terminal...

Master Plan Development for Jet Fuel Facilities Services at Al Maktoum International Airport
Penspen supports the development of the world's largest airport with master plan development for jet fuel facilities services at Al Maktoum International...

Gap Analysis for Aviation Fuel Systems at Hamad International Airport
Penspen carries out Gap Analysis for aviation fuel systems at Hamad International Airport in...

FEED Services for Aviation Fuel Farm Rehabilitation Project at Erbil International Airport
FEED Services for Aviation Fuel Farm Rehabilitation Project at Erbil International...